Transport Locks
15. Once the cylinders are connected, raise the unit com-
pletly. If the transport locks
are in place, remove them
at this time.
16. Store the transport locks
on the main frame as
shown.
17. Once the locks are removed, unfold the wings.
Note: Make sure no one is under the wings during the un-
folding process. Watch for leaks and make sure hoses
do not get pinched during the initial unfolding process.
18. Once the machine is unfolded, raise and lower the
machine several times to purge air from the lift system.
Again, watch for any leaks and tighten if necessary.
19. Check the tire pressure for proper inflation and check
the tightness of lug bolts.
First Time Field Adjustments
Pre-Leveling of Machine
Note: Pre-leveling of machine should be done on a good lev-
el surface (preferably concrete).
Main Frame Leveling
20. Lower the machine until discs (on center frame) are 1 to
2” above the surface. Set the depth stop at this depth.
Raise and then re-lower machine to depth stop. Center
frame may need to be leveled from side to side. Measure
the height from center of the walking beam pivot
to the
bottom of the center frame
on both sides.
21. If they do not match from side to side, adjust center turn-
buckle as shown below.
Figure 8
Transport Locks
42108
1
1
Figure 9
Transport Locks Storage
42107
2
2
Figure 10
Center Frame Adjustment
42102
1
2
1
2