Transport locks, Wing fold, Pre-leveling of machine – Great Plains 4000TC Operator Manual User Manual
Page 24: Front to rear leveling
![background image](/manuals/598880/24/background.png)
20
1200-4000TC
Great Plains Manufacturing, Inc.
586-239M
08/01/2012
Transport Locks
11. Once the cylinders are connected, raise the unit com-
pletly. If the transport locks
are in place, remove them
at this time.
12. Store the transport locks
in hole of the lift mechanism
link.
Wing Fold
13. If wing stop pins
are installed remove pins from wing
stop clevis
.
14. Install pin in storage tube
on wing stop.
15. Once the transport locks and wing stop pins are
removed, unfold the wings (if folding unit).
Note: Make sure no one is under the wings during the unfold-
ing process. Watch for leaks and make sure hoses do
not get pinched during the initial unfolding process.
16. Once the machine is unfolded, raise and lower the
machine several times to purge air from the lift system.
Again, watch for any leaks and tighten if necessary.
Pre-Leveling of Machine
Note: Pre-leveling of machine should be done on a good level
surface.
Front to Rear Leveling
17. Lower machine so front coulters gangs are 1-2” off of
ground. Loosen jam nut
with turnbuckle wrench
(stored on center tube pegs of hitch). Adjust the turn-
buckle
at the front of machine to level it front to back.
(Shorten to bring front down, extend to bring front up).
18. When the front coulter gangs are the same distance off
ground as rear coulter gangs retighten jam nut
.
Figure 7
Transport Locks
42066
1
2
1
2
Figure 8
Wing Fold Pins
42067
1
3
2
1
2
3
Figure 9
Hitch Turnbuckle Adjustment
41073
2
3
1
1
2
3
1