Field operation, Field set-up checklists, Final checklist – Great Plains 4000TC Operator Manual User Manual
Page 23: Field operation field set-up checklists
![background image](/manuals/598880/23/background.png)
Great Plains Manufacturing, Inc.
Operating Instructions
19
08/01/2012
586-239M
Field Operation
This implement is designed to be pulled in the field with
the turbo-chopper engaged (including wide turns).Lifting
for short distances to clear residue clogs is acceptable.
Lifting for tight turns or reverse moves is required.
Equipment Damage Risk:
Lift for tight turns and reverse moves. Tight turns can result in
a section moving backward. Never back up with harrows on
the ground. If the inside tire stops or rolls backward, the turn is
tight and requires lift.
Field Set-Up Checklists
Use the following tables to develop a final checklist for
your tractor/Turbo-Chopper configuration. Additional or
fewer steps may be necessary depending on tractor fea-
tures, Turbo-Chopper options and accessories.
Final Checklist
Mechanical Checklist
Page
❑ Turbo-Chopper hitched
❑ Hitch pin locked
-
❑ Safety chain secured to tractor or leading
implement
❑ Parking jack stowed
❑ Check all tire pressures
❑ Transport locks and locking valves are in
the field position
Hydraulic System Checklist
Page
❑ Check tractor hydraulic reservoir full
-
❑ Make hydraulic connections
❑ Inspect connections for leaks
-
❑ Unfold Implement
-
Perform all steps in “Pre-Start Checklist” on page 17
and “Final Checklist” on page 19.
Do not make short radius turns with the implement in the
ground.
Note: If you stop in the middle of a pass, raise the imple-
ment and back up 10’ before resumption of tilling.
Electrical Checklist
Page
❑ Verify electrical hookups solid, or connec-
tor securely stowed if not using lights in
field.
First Pass Operation Checklist
Page
1. Implement unfolded and aligned for first
pass.
-
2. Pull forward, lower Turbo-Chopper, and
begin tilling for a short distance.
-
3. Stop. Assess:
• coulter depth
• finishing attachment operation
-
4. Make necessary adjustments
Sharp Field Turns Checklist
Page
1. Raise Turbo-Chopper
-
2. Make turn
-
3. Lower Turbo-Chopper
-
4. Resume tilling.
-
Ending Tilling Checklist
Page
1. Suspend operations as above
-
2. Lift implement
-
3. Set tractor for fold
4. Fold wings
-
5. Place transport locks in transport position
6. Lower implement on to transport locks
-
7. Lights ON for transport
-