Caution – Great Plains 2SNT30 Assembly Instructions User Manual
Page 9

4/9/04
1-7
113-395M
9. The transport carrier arm (# 45) will bolt directly to the pull bar lugs on the 30’ box frame Fig. 6. Hold the carrier in
place by passing the two u-bolts (# 47) over the carrier tube, and through the holes in pull bar ears.Tentatively, tighten
the u-bolts with the lock washers (# 48) and nuts (#49) so that the top of the carrier is approximately29 3/8" above the
top surface of the box's 6" x 8" frame tube. On the 24’ drill Fig. 7, the transport carrier is mounted to the box frame be-
tween the cylinder lug and the pull bar mount by means of the mounting bracket (#52). It is held in place with the two
1/2" x 6" x 9 1/4" u-bolts (#53), flat washer, lock washer, & nut (#54, #55, #56). Fasten the carrier to the mount by passing
the two u-bolts (# 47) over the carrier tube, and through the holes in the pull bar ears.Tentatively, tighten the u-bolts with
the lock washers (# 48) and nuts (#49) so that the top of the carrier is approximately 29 3/8" above the top surface of
the box's 6" x 8" frame tube.
Mount the transport saddle (# 50) on the top of the carrier arm (# 45) using the u-bolts (# 51), lock washers (# 48) and
nuts (# 49). On 24' drills Fig. 7 it is important that the saddle (# 50) be positioned so that the offset in the saddle is to the
outside of the drill as shown.
11201
11701
NOTE:
Dual Marker Installations: To complete the installation, repeat steps 3 through steps 9 on the opposite marker.
All Installations: After all parts are in place, go back over the entire installation and tighten every bolt and u-bolt.
Refer to the torque chart in the front of your drill's owners manual. U-bolts can be torqued to grade 5 bolt values.
When finished, read and follow the MARKER HYDRAULIC SYSTEM INSTALLATION section of this manual.
!
CAUTION!
BEFORE FOLDING THE MARKER(S) FOR THE FIRST TIME, READ THE
SECTION ON ADJUSTMENTS IN THIS MANUAL.
INSTALLATION INSTRUCTIONS: 1993 2SNT 24’ & 2SNT 30’ MARKERS (CON’T.)
Transport Carrier Mounting 30’ Drill
Fig. 6
Transport Carrier Mounting 24’ Drill
Fig. 7