Fertilizer meter rate charts – Great Plains FCP1000 Operator Manual User Manual
Page 29

27
Section 3 Adjustments
7/5/2005
FCP1000 Three-Meter Drill and Hitch 148-693M-A
Great Plains Mfg., Inc.
11. Weigh metered material. Subtract weight of emp-
ty container. Divide by three. Multiply by number
of openers on your drill to determine total kilo-
grams (pounds) metered per hectare (acre). If
this figure is different than desired, reset sprock-
ets accordingly.
NOTE: You may want to repeat calibration procedure
if your results vary greatly from fertilizer rate chart.
12. When drilling, check metering rate by noting hec-
tares (acres) drilled, amount of fertilizer added to
drill and level of material in drill box. If you are ap-
plying more or less fertilizer than desired, adjust
metering rate slightly to compensate for field con-
ditions.
For 157.9 mm (6. 2 in.) Row Spacing
Metering
Rate
Sprockets
Metering
Rate
Sprockets
kg/har lb/acre Range Driver
Driven
kg/har lb/acre Range Driver
Driven
48.8
42
Low
12T
21T
141.7
122
High
12T
20T
51.1
44
Low
12T
20T
142.9
123
Low
20T
12T
54.6
47
Low
12T
19T
148.7
128
High
12T
19T
56.9
49
Low
12T
18T
151.0
130
Low
21T
12T
60.4
52
Low
12T
17T
156.8
135
High
12T
18T
63.9
55
Low
12T
16T
166.1
143
High
12T
17T
69.7
60
Low
17T
21T
190.5
164
High
17T
21T
73.2
63
Low
17T
20T
199.8
172
High
17T
20T
76.7
66
Low
17T
19T
210.3
181
High
17T
19T
81.3
70
Low
20T
21T
224.2
193
High
20T
21T
90.6
78
Low
21T
20T
247.4
213
High
21T
20T
95.3
82
Low
21T
19T
260.2
224
High
21T
19T
99.9
86
Low
21T
18T
274.2
236
High
21T
18T
105.7
91
Low
21T
17T
290.4
250
High
21T
17T
112.7
97
Low
21T
16T
333.4
287
High
17T
12T
122.0
105
Low
17T
12T
352.0
303
High
18T
12T
128.9
111
Low
18T
12T
371.7
320
High
19T
12T
134.8
116
High
12T
21T
391.5
337
High
20T
12T
135.9
117
Low
19T
12T
410.1
353
High
21T
12T
Fertilizer Meter Rate Charts
Based on 1.04 kilograms-per-litre (65 pounds-per-cubic-foot) density