Pre-assembly preparation, Tools required, Work location – Great Plains NTA3007HD Operator Manual User Manual
Page 2: Prepare air drill
![background image](/manuals/598829/2/background.png)
2
Great Plains Manufacturing, Inc.
Contact Drive Update
166-367M
02/21/2012
Pre-Assembly Preparation
Tools Required
• cutting torch
• wire or rod welder, and welding safety equipment,
including a fire extinguisher
• ground (earthing) rod, cable and clamp (or access to
suitable electrical safety ground reference conductor)
• suitable tractor for raising and unfolding air drill
• Great Plains 821-001C spray paint, or green exterior
enamel close to Pantone 356C, DuPont 262 or
PPG 43817
• basic hand tools
Work Location
1.
Move the air drill to a location with:
Prepare Air Drill
2.
Raise implement with tractor.
3.
Unfold implement.
4.
Install lift and transport locks.
5.
Disconnect all harnesses to tractor.
6.
Connect a grounding cable from the center section
main frame to earth ground
• flat, non-combustible surface free of flammable
materials
• adequate illumination
• clear surface beneath for recovery of any falling or
dropped parts
Burn and Fire Hazards:
This update requires cutting and welding thick metal. Perform
the work clear of flammable materials. Wear suitable protec-
tive equipment. Allow hot parts to cool before continuing
work.
Crushing and Sharp Object Hazards:
Be careful working near openers. Discs and other parts may
be sharp.
Equipment Damage Risk:
Disconnect harnesses and ground frame before welding.
Connected harnesses or ungrounded frame during welding
can result in permanent damage to seed monitor components.