13 checks – Great Plains SLD600 Operator Manual User Manual
Page 28

28 Simba SLD
602-227M-ENG
2013-02-05
4.13 Checks
The working quality depends on the
adjustments and checks made prior to and
during work, as well as on regular servicing
and maintenance of the machine.
Before beginning work it is therefore
important to carry out any necessary
servicing and to lubricate the machine as
required.
Checks prior to, and during
work:
• Is the machine correctly hitched up and the
coupling device locked?
• Have the hydraulic lines been connected
according to the colour coding?
• Is the machine in a level operating position
and the working depth set correctly?
Working Elements
• Are the discs and other cultivation tools in
a serviceable condition?
• Are the scrapers still operable, so that the
rolls do not jam?
4. Adjustment / Operation