Danger, Prestart checklist, Hitching tractor to implement – Great Plains FCP1000 Predelivery Manual User Manual
Page 6
4
Section 2 Setup
FCP1000 Three-Meter Drill and Hitch 148-693Q
11/4/08
Great Plains Mfg., Inc.
Section 2
Setup
This section will help you prepare your tractor and imple-
ment for use.
Prestart Checklist
1.
Read and understand “Important Safety Informa-
tion,” page 1.
2.
Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.
3.
Check that all safety decals and reflectors are cor-
rectly located and legible. Replace if damaged. See
Safety Decals, “Important Safety Information,”
in the operator’s manual.
4.
Inflate tires to pressure recommended and tighten
wheel bolts as specified. See “Appendix,” page 20.
Hitching Tractor to Implement
!
DANGER!
You may be severely injured or killed by being crushed between
the tractor and drill. Do not stand or place any part of your
body between drill and moving tractor. Stop tractor engine and
set park brake before installing pins.
Refer to Figure 1
1.
Place hitch weldment (1) over ball swivel on hitch
tongue (2). Hold hitch weldment in place by inserting
spacer tube (3) through hitch clevis and ball swivel.
2.
Back tractor up to hitch and bolt hitch weldment to
tractor drawbar using 1” x 10” bolt (4), large flat
washer (5), lock washer (6) and nut (7).
3.
Use 3/4” x 9” bolt (8) to bolt hitch weldment through its
slotted hole and onto secondary hole of tractor draw-
bar. Install a 3/4” flat washer (9) next to top slotted hole
and fasten with a lock washer (10) and nut (11).
Tighten both bolts.
Figure 1
Drawbar Assembly Illustration
4.
Securely attach safety chain to tractor-drawbar frame.
Refer to Figure 2
5.
Remove jack from stob on side of hitch tongue and
place in transport position on implement.
Figure 2
Jack in Transport Position
17219