beautypg.com

Pre-assembly checklist – Great Plains FCP1000 Predelivery Manual User Manual

Page 5

background image

3

Section 1 Assembly

11/4/08

FCP1000 Three-Meter Drill and Hitch 148-693Q

Great Plains Mfg., Inc.

Section 1

Assembly

The following headings are step-by-step instructions for
assembling the CP1000. Begin Pre-Assembly Checklist to
make sure you have all necessary parts and equipment.
Then proceed with assembly as shown on the attached
handouts.

Pre-Assembly Checklist

1.

Read and understand “Important Safety Informa-
tion”
on page 1 before assembling.

2.

Have at least two people on hand while assembling.

3.

Make sure the assembly area is level and free of ob-
structions (preferably an open concrete area).

4.

Have all major components.

5.

Have all fasteners and pins shipped with the drill.

6.

Have a copy of the parts manual on hand. If unsure of
proper placement or use of any part or fastener, refer
to the parts manual.

7.

Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.

8.

Check for proper tension and alignment on all drive
chains.

9.

Check that all safety labels and reflectors are correctly
located and legible. Replace if improperly located or
damaged. Refer to Safety Labels, “Important Safety
Information”
in the operator’s manual.

10. Inflate tires to recommended pressure as listed on the

Tire Inflation Chart on the Appendix” on page 20.
Tighten wheel bolts as specified on Torque Values
Chart
on the Appendix” on page 20.

IMPORTANT: If a pre-assembled part or fastener is
temporarily removed, remember where it goes. Keep
the parts separated.