beautypg.com

Ehpr valve calibration, Power-up steering system, Connect hhct – Great Plains EHPR Valve Calibration User Manual

Page 3

background image

Great Plains Mfg., Inc.

Calibration Procedure

3

12/10/2008

401-565M

EHPR Valve Calibration

Power-Up Steering System

Refer to Figure 3

1.

Set the CALIBRATION switch

to

center/Off.

2.

Set the STEERING OVERRIDE switch

to

down/OFF

3.

Set the REVERSE STEER (Power) switch

to

Up/ON

4.

Confirm that only the power indicator

is illumi-

nated.

5.

Engage the hydraulic circuit for Fan/Steering.

6.

Briefly toggle the STEERING OVERRIDE switch
to Up/ON to confirm:
circuit active
flow direction correct (fan rotation direction)

Connect HHCT

Refer to Figure 4

7.

Before connecting the HHCT, set the
Valve Select switch

to

Center/OFF.

Refer to Figure 5

8.

At the planter hitch, locate the calibration lead
from the ECU - it is a short (~18in) cable terminated
in a 12-pin plug.

9.

Plug the HHCT cable receptacle into the calibration
cable plug.

IMPORTANT !

The calibration system is now live. Do not operate any
HHCT switches or buttons until instructed.

Figure 3

Steering Console

25242

1

2

3

6

7

5

4

3

2

1

4

2

Figure 4

833-510C HHCT Off

29197

1

1

Figure 5

Calibration Harness at ECU

29212

2

2