Have a licensed electrician provide power to the machine per the National
Electric Code ANSI/NFPA 70 and any local codes. Install an ON/OFF switch next
to the motor for the convenience of the operator. An example of this is shown in
Figure 5.2 Electric Switch Installation
5.3. OPERATING PROCEDURE
5.3.1. S
ET
-U
P
Follow this procedure when setting up and converting the machine from transport
to operating configuration.
1. Move
the
machine
to the desired operating location. Be sure to position the
machine so the transport vehicles have sufficient space to maneuver.
2. Set the park brake before dismounting the towing vehicle.
3. Install the jack on the Portable Pit frame.
4. Unhook the unit from the towing vehicle.
5. Remove and stow the hitch assembly and safety chain.
NOTICE
Locate the machine on reasonably flat and firm ground, free
from obstructions.
Placement on uneven or soft ground may cause excessive
loads on the machine or clearance issues. Corresponding
damage to the machine or transport vehicle could result.