beautypg.com

Quoizel TFAS1507VA Asheville User Manual

Page 3

background image

Figure 1

12” Rod

Thank you for purchasing a Quoizel product.

Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700

or visit us on-line at www.quoizel.com

2013 QuoizelInc.

3of5

STEP 1

Assemble Rods

-

A. Determine the Rods (H/I/J) to be assembled to the Socket

Assembly (G) according to your hanging height.

B. Pass Supply Wires and Ground Wire through the chosen

Rods (H/I/J) and then thread the chosen Rods (H/I/J) and
the Socket Assembly (G) together. Hand tighten until
snug.

6” Rod

6” Rod

12” Rod

Socket
Assembly

Supply Wire and
Ground Wire

STEP 2

Assemble Ceiling Canopy to Upper

Rod

-

A. Pass Supply Wires and Ground Wire through the Ceiling

Canopy (F) and then thread the Ceiling Canopy (F) and
the Upper Rod together. Hand tighten until snug.

Ceiling
Canopy

Upper Rod

Supply Wire and
Ground Wire

Figure 2

Assembly Instruction Sheet #IS-TFAS1507VA

For Style TFAS1507VA

May2013

6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com

,

.

.

.

STEP 3

Attach Mounting Screws, Lock

Washers and Hex Nuts to Crossbar

-

A. Line up a set of holes on the Crossbar (A) and Holes on

the Ceiling Canopy (F).

B. Thread Mounting Screws (B) into the holes on the

Crossbar (A), pass Lock Washers (C) and thread Hex Nut
(D) onto the Mounting Screws (B). Hand tighten until
snug.

Figure 3

Crossbar

Mounting Screw

Lock Washer

Hex Nut

Ceiling

Canopy