Quoizel KPR5009BN Kemper User Manual
Package contents, Warnings and cautions
Part
Description
Quantity
A
Crossbar
1 pc.
2 pcs.
1 pc.
2 pcs.
2 pcs.
2 pcs.
2 pcs.
Ceiling Canopy
B
C
D
E
F
Hex Nut
Lock Washer
Package Contents
Quoizel, Inc.
6 Corporate Parkway
Goose Creek, SC
29445
Customer Service
Phone 631.273.2700
Fax
631.231.7102
www.quoizel.com
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing
the fixture. We strongly recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool
before removal. Do not subject glass parts to any shock while in operation or shattering may result.
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700
or visit us on-line at www.quoizel.com
A
B
C
D
F
G
E
G
H
Mounting Ball
Mounting Screw
I
Assembly Instruction Sheet #IS-KPR5009BN
For Style KPR5009BN
6” Rod
1of6
H
2 pcs.
12” Rod
Tools Required: Flathead screwdriver, Phillips screwdriver, pliers, wire cutters, wire
strippers, electrical tape, safety glasses.
Estimated Assembly Time: 20-30 minutes
Preparation: Identify and inspect all parts before beginning installation. Check package
content list and diagrams below to be sure all parts are present. If any parts are missing
or damaged, do not attempt to assemble, install, or operate the fixture. Contact customer
service for replacement parts.
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,
.
.
.
2013 QuoizelInc.
1 pc.
Fixture Body
I
J
K
9 pcs.
J
K
Shade
9 pcs.
Socket Collar
Bulb Recommended: (9) Medium Base 100 W Maximum, (1) MR-16 GU10 Base
50W Maximum
September2013
M
L
1 pc.
MR-16
L
M
1 pc.
Plastic Suction Cup
N
1 pc.
Socket Collar Tool
N