Unitec American Parking Equipment User Manual
Page 47
Document
Number:
GC1001
43
Document Title:
Unitec APE Gate and Gate Controller for Multi-Lane Applications Installation Guide
Gate
Control
Signal name
Gate
Control
Terminal
Number
Gate
Control
PLC I/O
point
Device
Connection
Descriptive Use or
Operation
Open Gate 3
53
Y6
Output to Vend
Input of Gate at
Lane 3
Tied to the Vend input of the Gate,
This line will become 24VDC when
Gate 3is triggered to open. Note: This
is a sinking output. When testing,
reference from terminal 11(RED) to
Y6. When Y6 light is on, Terminal
53(Black) to 11(Red) should measure
24VDC
Open Gate 4
54
Y7
Output to Vend
Input of Gate at
Lane 4
Tied to the Vend input of the Gate,
This line will become 24VDC when
Gate 4 is triggered to open. Note:
This is a sinking output. When
testing, reference from terminal
11(RED) to Y7. When Y7 light is on,
Terminal 54(Black) to 11(Red) should
measure 24VDC
Ground G
N/A N/A
Electrical Ground
115V Line
L
N/A
N/A
115V Line (Hot)
115V Neutral
N
N/A
N/A
115V Neutral (Common
115V fused
5
N/A
N/A
Fused input power
24VDC
Regulated
6 N/A
N/A
Unfused 24VDC out of regulated PS
24VDC Fused
for PLC
F2 + N/A
Fused power for PLC
24VDC
Ground
10
-, C0, C1,
C0, C1
N/A
Ground (24VDC-) for PLC power and
communications signals
24VDC Fused
for External
11 V+ N/A
Fused 24VDC signal power for
communications signals