8 gate controller i/o definitions, Gate controller i/o definitions, Table 3. gate controller i/o definitions – Unitec American Parking Equipment User Manual
Page 45
Document
Number:
GC1001
41
Document Title:
Unitec APE Gate and Gate Controller for Multi-Lane Applications Installation Guide
8 Gate Controller I/O Definitions
The following information is provided for troubleshooting purposes.
Table 3. Gate Controller I/O Definitions
Gate
Control
Signal name
Gate
Control
Terminal
Number
Gate
Control
PLC I/O
point
Device
Connection
Descriptive Use or
Operation
Lane 1
Request
21
X0
Input from WSII
Lane 1
WSII at lane 1 will hold this line at
24VDC when a customer at Lane 1
has purchased a wash. WSII will
remove signal when Lane 1 Hold
turns off.
Lane 2
Request
22
X1
Input from WSII
Lane 2
WSII at lane 2 will hold this line at
24VDC when a customer at Lane 2
has purchased a wash. WSII will
remove signal when Lane 1 Hold
turns off.
Lane 3
Request
23
X2
Input from WSII
Lane 3
WSII at lane 3 will hold this line at
24VDC when a customer at Lane 31
has purchased a wash. WSII will
remove signal when Lane 1 Hold
turns off.
Lane 4
Request
24
X3
Input from WSII
Lane4
WSII at lane 4 will hold this line at
24VDC when a customer at Lane 4
has purchased a wash. WSII will
remove signal when Lane 1 Hold
turns off.
Gate 1 Open
31
X4
Input from Gate
Lane 1 Lockout
24VDC is present on this line when
Gate for Lane 1 is Open or Opening
Gate 2 Open
32
X5
Input from Gate
Lane 2 Lockout
24VDC is present on this line when
Gate for Lane 2 is Open or Opening
Gate 3 Open
33
X6
Input from Gate
Lane 3 Lockout
24VDC is present on this line when
Gate for Lane 3 is Open or Opening
Gate 4 Open
34
X7
Input from Gate
Lane 4 Lockout
24VDC is present on this line when
Gate for Lane 4 is Open or Opening
Merge Loop
35
X10
Input from one or
more merge
Loops from
Gates 1-4
24VDC is present when any of the
merge loops from Gates 1-4 is active.
No gates will initiate an Open if a
Merge Loop is active.