2 Mechanical Installation

2.1 Hardware Required

Prior to beginning the installation, take the time to verify that all the following required
parts are present and accounted for.

Items supplied with the Portal:

• Allen Wrench For Door
• Key set for door
• Key set for vault door
• IEC-320-C14 Female AC Power Connector

Items supplied with the Base:

• (3) ½: Hex Nuts
• (3) ½” Flat Washers
• (3) ½” Lock Washers

Items supplied with the Brick-in Option:

• Adapter Plate
• (4) J-Bolts and nuts (for securing the adapter plate)
• (3) ½:” x 1” Hex Bolts
• (3) ½” Flat Washers
• (3) ½” Lock Washers

2.2 Recommended Tools

2.2.1

Mechanical Installation Tools

The following tools are recommended for the typical mechanical installation of this
Portal TI unit and base:

• ¾” deep well socket and socket wrench
• Open end 9/16” wrench
• Small, thin blade, flat-tip screwdriver
• Hammer
• Dual-plane Level
• 50’ foot tape measure

The following items are required only when installing the Portal TI into an existing
concrete slab:

• Hammer drill
• 2.5” Concrete hammer drill bit