1 installation, 1 unpacking, 2 utilities / hook-up – Trebor PC7 User Manual
Page 3: Installation, Unpacking, Utilities / hook-up, 1installation

1
INSTALLATION
1.1 UNPACKING
After unpacking, the pump should be checked for any damage that may have
occurred during shipment. Damage should be reported to the carrier
immediately.
The following items should be included within the shipping container:
Qty
Item
Description
1
PC7F or PC7P
PC7 PUMP CONTROLLER
1
PC7-Manual
Manual, PC7 Pump Controller
1.2 UTILITIES / HOOK-UP
The controller can be mounted by any of three methods. It can be bolted to a wall
or deck using the snap on base slots as shown below using four ¼”(6mm) bolts
in the pattern shown below.
1 7/16"
1 7/16"
5/16" DIA
4X
1 7/8"
1 7/8"
MTD0616
BOLT PATTERN
BOLT PATTERN
CONTROLLER - BOTTOM VIEW
MTD0617
MTD0618
PUMP INSTALLATION - BACK
PUMP INSTALLATION - TOP
PC7 CONTROLLER OPERATION / MAINTENANCE MANUAL
PAGE 3