beautypg.com

8 assembly – Trebor 110E User Manual

Page 18

background image

PAGE 18

MODEL 110E PUMP OPERATION / MAINTENANCE MANUAL

4.8 ASSEMBLY

4.8.a Body Assembly

NOTE: Check Sleeves that fit too tightly for easy installation should be placed in
a freezer prior to assembly to assist insertion.

Figure 4-1

Insert suction sleeve, check ball and O-ring carefully into check bore.

NOTE: The Suction Sleeves have a shoulder diameter larger than their body
diameter. Additionally the Suction Sleeves when compared to the Discharge
Sleeves have a thicker top region which acts as a robust contact point for the O-
rings.

Repeat insertion process with the discharge sleeve, check ball and O-ring.

Repeat process for second check bore.

Replace check cap seals and tighten check bore caps to 35in-lbs.

Install shaft seals into shaft bore grooves.

Thread shaft into push plate until engagement with the shaft shoulder is

achieved. Additionally apply a ¼” turn to ensure proper installation.

Insert shaft through shaft bore using shaft bullet as shown (This prevents

damage to the TFE shaft seals and prevents dislodgement of shaft seals).