3 glp - validation, Glp - validation – Metrohm 806 Exchange Unit User Manual
Page 34

5.3 GLP - Validation
■■■■■■■■■■■■■■■■■■■■■■
26
■■■■■■■■
806 Exchange Unit
5.3
GLP - Validation
Every drive and every dosing unit manufactured by the Metrohm Co. is
subjected to rigorous quality controls prior to shipment. Every dosing unit
is issued a quality certificate attesting conformance with the strict quality
criteria of Metrohm. GLP (Good Laboratory Practice) requires, among
other things, periodic inspection of analytical measuring devices with
respect to precision and correctness on the basis of standard operating
procedures Standard Operating Procedure, SOP). This may also include
an inspection of dosing accuracy.
Recommended literature
■
Metrohm brochure "Quality management with Metrohm", detailed
information concerning the principles and procedural methods of
Good Laboratory Practice
■
Metrohm Applications Bulletin 283/1 Validation of Metrohm burets
The validation of burets is carried out by the Metrohm service with special
software.
The Metrohm agents worldwide offer the possibility of on-site inspections
and certifications of dosing units and Dosinos with respect toaccuracy. It is
recommended that an accuracy inspection be performed when the dosing
cylinders and dosing pistons of a dosing unit are replaced.