beautypg.com

Metrohm 930 Compact IC Flex Oven/ChS/PP User Manual

Page 41

background image

■■■■■■■■■■■■■■■■■■■■■■

4 Installation

930 Compact IC Flex Oven/ChS/PP (2.930.2300)

■■■■■■■■

33

Visually inspect whether all capillaries and their connections from
the high-pressure pump to the detector are leak-tight. If eluent is
leaking out anywhere, tighten the corresponding pressure screw
further, or loosen the pressure screw, check the end of the capil-
lary and shorten it using the capillary cutter if necessary and
retighten the pressure screw.

4 Conditioning the system

Rinse the system with eluent until the required stability of the base-
line is attained (normally 30 minutes).

The instrument is now ready for measuring samples.