3 installation, 1 setting up the instrument, 1 packaging – Metrohm 919 IC Autosampler plus User Manual
Page 19: 2 checks, 3 location, 2 connecting the power supply cable, Setting up the instrument, Packaging, Checks, Location
■■■■■■■■■■■■■■■■■■■■■■
3 Installation
919 IC Autosampler plus
■■■■■■■■
11
3 Installation
3.1
Setting up the instrument
3.1.1
Packaging
The instrument is supplied in highly protective special packaging together
with the separately packed accessories. Keep this packaging, as only this
ensures safe transportation of the instrument.
3.1.2
Checks
Immediately after receipt, check whether the shipment has arrived com-
plete and without damage by comparing it with the delivery note.
3.1.3
Location
The instrument has been developed for operation indoors and may not be
used in explosive environments.
Place the instrument in a location of the laboratory which is suitable for
operation, free of vibrations, protected from corrosive atmosphere, and
contamination by chemicals.
The instrument should be protected against excessive temperature fluctu-
ations and direct sunlight.
3.2
Connecting the power supply cable
WARNING
This instrument may only be operated with the supply voltages specified
(see rear of the instrument).
Protect the connection sockets against moisture.
P: 115W U: 100 - 240 V f: 50 - 60 Hz
Nr
.
Figure 6
Connecting the power supply cable