Transport and Installation of the Machine
After Unloading
•
Remove all packing and wrapping material
•
Check machine and accessories for damages
•
Check for missing parts
Have the machine installed by BAUM service personnel, exclusively!
In Case of Complaints
The installation of the machine requires special skills which can be
Immediately send written note to:
guaranteed only by especially trained experts of BAUM agencies.
•
Railway or shipping company
Arbitrary working on the machine may damage the machine itself or other
•
Insurance company
material property of the user or cause accident endangering life and limb
•
BAUM / Agency
of the staff.
The machine must be unpacked, moved, transferred and installed by
authorized BAUM Service Technicians only. Dangers might arise from the
Place of Installation
machine itself or from its packing if it is unpacked, moved, transferred or
installed with unsuitable devices.
The location must meet the following requirements:
While the machine is unpacked, moved, transferred and installed, no
•
Vibration free location
other persons must be present in the range of the machine or its packing.
•
Even concrete flooring, concrete property class min. (N/mm²) according to
eurocode 2: C20/25 or according to DIN1045: B 25.
The BAUM Service Technician must also take care that no unauthorized
•
Observe carrying capacity!
persons work at the machine, its packing or the installation equipment.
•
Avoid possible accidents of operator by uneven flooring
•
Adhere to minimum distance from buildings or peripheral equipment (see
plan)
After the Installation of the Machine
1.
Remove anti rust paint (agent: kerosene, gasoline) from the machine on
the site of installation
Note:
Do not use any sharp tools to remove anti-rust paint!
2.
Clean plastic covers only with plastic cleansing agent
3.
Final check according to check list
4.
Have handover signed