Vararam Tri-Power User Manual
Step one

PLEASE READ CAREFULLY AND COMPLETELY
BEFORE BEGINNING THIS INSTALLATION,
you will find many helpful hints in the instructions.
IF YOU ARE UNCOMFORTABLE WITH ANY ASPECT OF THIS INSTALLATION PLEASE REFER
THIS TO AN EXPERIENCED SERVICE TECHNICIAN.
Tools needed:
1 flat head screwdriver
1 10mm wrench or socket
1 small soft towel (its going to get dirty)
1Box knife or cutting tool ex.. Pliers, shears etc..(Avalanche)
Removing the factory intake system.
Remove factory engine cover by lifting up and pull towards the front of the vehicle, you will re-install this later.
Remove the PVC line as shown
Remove the factory air box by unscrewing the hose clamp directly on the box. Pull directly up on the box, it will release with
a pop! Remove the factory air tube by popping it loose from the black plastic grommets located at the middle of the radiator
hose, lossen hose clamp from throttle the body, the hose and intake will lift out.
Mass airflow harness-- You will need some slack in the wiring loom for later relocation, to get the added length needed. Pull on
it and find the plastic grommets on your fender, pop these loose, one or two should be fine, just enough to reach the mouth of
your throttle body.
Step one