Retsch BB 50 User Manual
Page 34

Cleaning, wear and service
34
•
Simultaneously press the buttons RESET+START for 2 seconds.
The currently set operating time until calibration flashes in the gap width (F1)
display (default: 50h) and h is displayed in the speed (F2) display.
•
Briefly press the button (F4 +) to increase the operating time in increments of
10.
•
Briefly press the button (F4 -) to decrease the operating time in increments
of 10.
Fig. 33: Operating time until the calibration alert
Pos : 13.1 /0005 RET SCH/ 0005 R ETSCH Bedienungsanlei tungen Kapit elsamml ung en/------- Seitenumbr uch ----------- @ 0\ mod_1222344373758_0. doc x @ 2386 @ @ 1
F6
22.04.2014
14:23
See also other documents in the category Retsch Equipment:
- BB 100 (24 pages)
- BB 200 (24 pages)
- BB 300 (24 pages)
- Cryomill (68 pages)
- CryoMill Autofill 50l (28 pages)
- DM 200 (20 pages)
- DM 400 (60 pages)
- Emax (67 pages)
- GM 200 (44 pages)
- GM 300 (44 pages)
- MM 200 (32 pages)
- MM 400 (32 pages)
- PM 100 (44 pages)
- PM 400 (36 pages)
- PM GrindControl (48 pages)
- RM 200 (36 pages)
- RS 200 (32 pages)
- SK 100 (24 pages)
- SM 100 (48 pages)
- SM 200 (48 pages)
- SM 300 (44 pages)
- Cyclone - SM 300 (20 pages)
- SR 200 (24 pages)
- SR 300 (24 pages)
- TWISTER (44 pages)
- ZM 200 (32 pages)
- AS 200 jet - Automatic Vacuum Regulation (6 pages)
- AS 200 control - natural frequency (32 pages)
- AS 200 (36 pages)
- AS 200 jet (56 pages)
- AS 200 jet (48 pages)
- AS 200 tap 30.025.0001 (28 pages)
- AS 200 tap 30.025.1001 (28 pages)
- AS 300 (32 pages)
- AS 400 (32 pages)
- AS 400 (28 pages)
- AS 450 basic (40 pages)
- AS 450 basic (44 pages)
- AS 450 control (52 pages)
- DR 100 (40 pages)
- DR 100 (28 pages)
- PP 25 (32 pages)
- PP 40 (28 pages)
- PT 100 (36 pages)