PAGE 28 — C-30HDN PUMP — OPERATION AND PARTS MANUAL — REV. #11 (03/29/12)

System Shut-Down

1. Place the

pumping control switch

in the OFF position

(Figure 20).

2. Push the

throttle contro

l in all the way (idle). Let the

engine run at idle speed for 3-5 minutes.

3. Turn the

ignition key

(Figure 21) to the OFF position.

4. Clean pump as referenced in the maintenance section of

this manual.

7. Let the engine run for 3-5 minutes before putting pump into

operational use. Push the

choke knob

in all the way.

8. Listen for any abnormal sounds. If any mechanical or elec-

trical problems exists, STOP the engine and correct the
problem.

9. To begin pumping concrete, place the

pumping control

switch

in the ON position (Figure 23).

Figure 22. Control Box Status Lamps

6. Verify that the

oil pressure

,

battery

and

water tempera

-

ture

status lamps (Figure 22) are all OFF. If any of these

lamps are ON, stop the engine and correct the problem.

Figure 23. Pumping Control Switch (OFF)

C-30HDN INITIAL START-UP