st3020b1/bCUL sUb. pUmp • operation and parts manUaL — rev. #2 (10/28/10) — page 17

Figure 10. CB200 Control Box (Old Style)

Dual Float Switch Application Diagram

CLASS

AUTO

HAND

30

20

10

30

20

10

FLC (A)

16

12

6.4

7

8

10

STOP
RESET

2

4

6

1 2 3 4

1 2 3 4

FUSE

L1

L2

L3

L1

L2

L3

X2

XF

X1

H4

H2

H3

H1

110

115

120

X1

GREEN

RED

BLACK

EXTERNAL

(230 V

)

POWER SOURCE

AC

CIRCUIT

BREAKER

RED

BLACK

L1

L2

GREEN

GROUND

SUBMERSIBLE

PUMP

BLACK

RED

START FLOAT

SWITCH. CONNECT

TO TERMINALS 1 AND 2

STOP FLOAT

SWITCH. CONNECT

TO TERMINALS 3 AND 4

PUMPING

RANGE

SECURE FLOAT SWITCH

WIRES TO PUMP

DISCHARGE HOSE

MOUNT CONTROL

BOX IN AN UPRIGHT

VERTICAL POSITION

AS SHOWN.

FLOAT

SWITCH
INPUTS

FLOAT SWITCH

TERMINAL BLOCK

AC POWER

TERMINAL BLOCK

ELECTRONIC OVERLOAD

MODULE TERMINAL BLOCK

MTE

CONTACTOR

WARNING

CONTROL BOX INSTALLATION IS TO BE
PERFORMED BY A LICENSED ELECTRICIAN
OR QUALIFIED PERSONNEL.

THE POSSIBILITY OF ELECTRICAL SHOCK
OR ELECTROCUTION EXISTS, WHICH COULD
CAUSE SEVERE BODILY HARM EVEN DEATH!.

POWER INPUT CABLE

TO CONTROL BOX

POWER INPUT

TO CTRL BX.

TERMINAL BD.

1Ø 230 VAC

POWER OUTPUT

TO PUMP

NOTE:
REFER TO OPERATION MANUAL
FOR THE CORRECT SETTING OF
THE ELECTRONIC OVERLOAD UNIT.

JUMPER

WIRE

CHECK JUMPER SETTINGS ON
TRANSFORMER, REFERENCE
CB200 WIRING DIAGRAM. 230 VAC
CONFIGURATION SHOWN.

NOTE:

TB1

B

A

B

SINGLE

FLOAT SWITCH

APPLICATION

MODEL SW1WOPA

NOTICE

For correct wiring to pump motor (1Ø, 230 VAC), add

a 16 AWG. jumper wire approximately 5-inches in

length between the input terminal block marked L3 and

terminal 4 on the electronic overload unit. Reference

CB200 wiring diagram (old style)

flOat switches (cOntrOl bOx)