MK Diamond MK-101-24 User Manual
Page 18
18
(B)
Align Cutting Head rear Pivot
Hole to the Post Pivot Shaft
and slide onto shaft.
NOTE: If the cutting head is installed, go to the next step.
(A)
Ensure Cutting Head Stop is in
upward position.
(C)
Install the Cutting Head onto the
Post Pivot Shaft and install the
Adjusting Knob.
For maximum cutting length,
the Cutting Head should be in
the front pivot hole and the Post
should be in the rear post
retaining hole.
NOTE: For small tiles (6" tile or smaller) the Cutting Head should
be in the rear pivot hole and the Post should be in the forward post
retaining hole. For large tiles and maximum cutting length, the Cut-
ting Head should be in the front pivot hole and the Post should be
in the rear post retaining hole.
NOTE: Move Cutting Head Stop in upward position when using
rear pivot hole and in the down position when using front pivot
hole, refer to page 24.
Cutting Head Installation
Follow the assembly instructions to prepare your MK-101-24 for operation.
MK-101-24
ASSEMBLY
CAUTION
The cutting head is heavy. Care must be used when installing it.