Installation check
After the installation has been completed, check the wiring with regard to
completeness, short circuit, and earth faults:
ƒ
Power connection:
Polarity of the DC−bus voltage supply via terminals +UG, −UG
ƒ
Motor connection:
In−phase connection to the motor (direction of rotation)
ƒ
Wiring of "safe torque off" (formerly "safe standstill")
ƒ
Feedback system
ƒ
Control terminals:
Wiring adjusted to the signal assignment of the control terminals.
)
Note!
The next step is the commissioning. Relevant information can be
found in the mounting instructions of the ECS axis module.
ƒ
Read the mounting instructions before switching on the axis
module.
ƒ
Carry out the commissioning according to the instructions in the
mounting instructions.
ƒ
If you use the "safe torque off" function, you must check the
function of the circuit.