Accumulators, 5charging & gauging units, Pressure increase – HYDAC FPS Series User Manual

Page 5: Filling, Removal of charging and gauging unit, Disconnection, Completion

background image

5

Charging & Gauging Units

PN#02068202

• ACU1107-1367 / 09.11

ACCUMULATORS

Pressure Increase

When charging an accumulator that has

an existing gas precharge, allow 5 to 10

minutes for the gas temperature and thus

pressure to stabilize.

FPS Unit

Turn T-handle clockwise until the gauge

needle begins to deflect, then turn it another

full turn. Proceed to “Filling”.

FPK Unit

Turn T-handle counter clockwise until the

gauge needle begins to deflect, then turn it

another full turn. Proceed to “Filling”.

FPK Unit

(with adapter FPK/SB)

Turn T-handle clockwise until the gauge

needle begins to deflect, then turn it another

full turn. Proceed to “Filling”.

Filling

Open the shut-off valve on the commercially

available nitrogen bottle and slowly fill the

accumulator with dry nitrogen gas.
Precharge very slowly until the pressure

in the accumulator reaches 100 psi. Once

100 psi is reached, the charging rate can

increase. Charging too quickly may damage

the accumulator.
Note: The gauge registers the line pressure,

not necessarily the accumulator pressure

while charging.
After allowing the appropriate time for

the gas temperature and thus pressure to

stabilize, adjust the gas precharge pressure

as required, refer to “Pressure Increase”

(see

page 4)

or “Pressure Release”

(see page 3)

.

Once the desired gas precharge pressure

is reached close the shutoff valve on the

commercially available nitrogen bottle.

Remove the charging and gauging unit from

the gas valve as described under “Removal

of Charging and Gauging Unit”

(see page 5)

.

Removal of Charging and

Gauging Unit

Close the shut-off valve on the commercially

available nitrogen bottle before removing

the charging and gauging unit.

FPS Unit

Turn T-handle counter clockwise until

resistance is felt to close the gas valve.

Open manual bleed valve to relieve pressure

in the charging and gauging unit. Proceed to

“Disconnecting”.

FPK Unit

Turn T-handle clockwise until resistance

is felt to close the socket head cap screw,

hand tighten. Open manual bleed valve to

relieve pressure in the charging and gauging

unit. Proceed to “Disconnecting”.

FPK Unit

(with adapter FPK/SB)

Turn T-handle counter clockwise until

resistance is felt to close the gas valve.

Open manual bleed valve to relieve pressure

in the charging and gauging unit. Proceed to

“Disconnecting”.

Disconnection

Unscrew the charging and gauging unit

from the gas valve. Note: For FPK unit with

adapter FPK/SB it may be necessary to

loosen the connection between cap nut

and the adapter to remove the charging

and gauging unit. Check for leaks. None are

permissible.

Completion

HYDAC gas valve version 1

(see fig. 1)

Tighten socket head screw cap to 20 Nm

(15 lb-ft), and screw on valve protection cap

(where applicable)

; hand tighten.

HYDAC gas valve version 4

(see fig. 1)

Screw on valve seal cap torquing to 30 Nm

(22 lb-ft), and valve protection cap

(where

applicable)

; hand tighten.