Elkhart Brass X-Stream SM500E – SM2000E User Manual
Page 6
![background image](/manuals/558303/6/background.png)
6
III INSTALLATION INSTRUCTIONS
Installation Steps
1. Insure the gasket is present in the nozzle inlet before installing onto monitor or Stream Shaper.
2. Position nozzle so the actuator assembly is located on the top of the nozzle. You may position the
actuator assembly on the left side of the nozzle as well; however, we recommend the top position for
optimal clearance, manual override accessibility, and durability.
3. Then tighten the nozzle swivel base to the Stream Shaper or monitor.
4. Connect power cable to the electrical plug on the nozzle actuator assembly.
IV SPECIFICATIONS
General Specs
Input Power
12 VDC or 24 VDC
Electrical
Load 3
AMPS
Nozzle Dimensions
Ø6 7/8” X 9 5/16” L (SM500E, SM1000E, SM1250E)
Nozzle Dimensions
Ø7 15/16” X 10 1/16” L (SM2000E)
Nozzle Weight
Approx. 10 lbs
Operating Temperature Range
-40
o
C to +85
o
C
V OPERATING INSTRUCTIONS
Nozzle is normally electrically actuated through Monitor Control System. It will free wheel at both ends of
stroke (fog and straight stream). Please note that the nozzle does not have a shut-off function.
When monitor is not in use, return it to its designated park position. We recommend storing in full fog facing
downward to allow nozzle to drain. However, some operating requirements may override this.
Manual Override Operation
The nozzle tip can be adjusted easily by using the override bolt and a 3/4” drive ratchet, by rotating the bolt
counter-clockwise for straight stream or clockwise for fog patterns.