INSTALLATION

INSTRUCTIONS

ITEMS TO BE SUPPLIED BY THE INSTALLER

• 3/8” x 3 ½” (minimum) Anchor Bolts (8 per gate)
• Miscellaneous support bracing (angle or channel) as required

TOOL REQUIREMENTS

safety glasses

hard hat (if job requires)

Allen wrenches to 3/8”

screws

5/16” hex head driver bit for TEK

hammer

“C” clamps

hammer drill

carpenter square

4’ level

chalk line

25’ tape measure

4” angle grinder

slip joint pliers

drift punches

open end wrench set to 3/4"

drill bits to 3/8”

screw driver sets (flat and Phillips)

electric drill

socket set, 1/4” and 3/8” drives

hack saw (or port-a-band)

taps and tap wrench to 3/8”

extension cords

welding equipment

Other items to consider are:

• Cables/chain with 1000 lb lifting capacity
• Chain fall or come-a-long
• Fork

lift

• Sledge

hammer