beautypg.com

9 drive belt replacement (cont.), 10 replacing the rotor bearings, English – Echo CH45540 Owners Manual v.5 User Manual

Page 17

background image

4.5 INCH CHIPPER

13

ENGLISH

SERVICE & MAINTENANCE

BEFORE INSPECTING OR SERVICING ANY PART OF THIS MACHINE, SHUT OFF POWER SOURCE,

DISCONNECT SPARK PLUG WIRE FROM SPARK PLUG AND MAKE SURE ALL MOVING PARTS HAVE COME TO A COMPLETE STOP.

WARNING

REAR DRIVE BELT

1. Move the engagement lever to the RELEASE

position.

2. Disengage PTO and shut off tractor engine.

3. Remove the PTO shaft from the tractor and disconnect

from the 3 point hitch.

4. Remove the forward belt shield by removing the eight

5/16 x 3/4" bolts and washers securing the shield to

the chipper housing.

5. Loosen the eye bolt to release tension on the belt

(Figure 5.6).

6. Remove the 3/8 x 3-1/2" hex bolt, washer and nut

securing the idler pulley to the idler weldment. Remove

the idler pulley.

7. Remove the 3/8 x 4" hex bolt, washers, spacers and

nylock nut securing the idler weldment to the chipper

housing. Move the idler weldment out of the way.

8. Remove the old belt and install the new belt.

9. Reattach the idler weldment to the chipper housing.

10. Reattach the idler pulley to the idler weldment.

11. Tighten the eye bolt until the belt deflection is about

7/16" when a 20 lb. load is placed against the belt.

12. Reinstall the forward belt shield using eight 5/16 x 3/4"

bolts and washers.

Figure 5.6, Rear belt drive replacement

REMOVING THE OLD ROTOR BEARINGS
1. Move the engagement lever to the RELEASE

position.

2. Disengage PTO and shut off tractor engine.
3. Remove the front belt shield.
4. Remove the front bearing snap ring. Then, remove the

1/2 x 1-1/2" hex bolts that connect the front bearing to

the bearing support weldment.

5. Take off the bearing support weldment by removing

four 3/8" nylock nuts.

6. Remove the front bearing snap rings and loosen the

bearing set screw.

7. Slide the front bearing off the rotor shaft.
8. Remove the 3/8 x 3-3/4" hex bolt, washers and nylock

nut securing the idler pulley to the idler bracket. Remove

the idler pulley.

9. Remove the drive belt from the pulleys.
10. Using the push bolts from the bushing, remove the

sheave and bushing from the rotor shaft.

11. Remove the 1/2" centerlock nuts holding the rear

bearing to the chipper frame.

12. Remove the bearing snap rings and loosen the set

screw. Slide the bearing off the shaft.

5.9 DRIVE BELT REPLACEMENT (CONT.)

5.10 REPLACING THE ROTOR BEARINGS

10. Reattach the idler pulley to the idler bracket.
11. Tighten the eye bolt until belt deflection is 7/16" when a

20 lb. load is placed against the belt (Figure 5.4).

12. Slide the bearing support weldment onto the rotor

shaft. Secure the weldment to the chipper housing

with four 3/8" x 1" carriage bolts, washers and nylock

nuts. Attach the front bearing to the weldment with two

1/2 x 1-1/2" bolts, washers and nuts. Tighten bearing

bolts to 120 ft-lbs.

13. Reinstall bearing snap ring.
14. Reinstall the front belt shield using four 5/16 x 5/8"

hex bolts, four 5/16 x 3/4" hex bolts and eight 5/16"

flat washers.