beautypg.com

Warning – Echo 70487 User Manual

Page 2

background image

Instruction Sheet

Install belt guard support bracket onto top 1/2" bolt for

7.

bearing on main frame and secure with 1/2" lock nut.

If you are installing the blower on the PTO chipper,

8.

remove the two small plates from the belt guard to
allow the guard to fit around the legs of the chipper

Install belt guard with four (4) 5/16" bolts and washers

9.

from the kit.

Install blower deflector on the blower tube with two (2)

10.

5/16" x 3/4" carriage bolts, one locknut and one spout
knob. Install the blower tube onto the blower assembly
and secure with the clamp.

OPERATION

Read and follow all safety instructions in your machine
owner's manual. Failure to operate the machine in
accordance with the safety instructions MAY RESULT
IN PERSONAL INJURY!

Before inspecting or servicing any part of this machine,
shut off power source and make sure all moving parts
have come to a complete stop.

WARNING

Test run the machine after installing the blower and

1.

check the belt guard to make sure the belts do not
rub, adjust if needed. Check bolt torque after a few
hours of use.

Feed materials slowly into the chipper and shredder

2.

chutes to get used to the rate of discharge. The
machine may discharge materials slightly slower with
the blower and discharge tube installed.

To rotate the blower discharge tube, loosen the clamp

3.

around the base of the tube, reposition the tube, and
tighten the clamp.