Preventive maintenance and inspection schedule -49 – JLG 45e Service Manual User Manual
Page 74

SECTION -
-48
– JLG Lift –
3120861
Table 2-3.
PREVENTIVE MAINTENANCE AND INSPECTION SCHEDULE
AREA
INTERVAL
PLATFORM AND BOOMS
DAILY
WEEKLY
MONTHLY
3 MONTH
6 MONTH
YEARLY
1.
Platform Gate
1, 4
12
2.
Platform
1, 4
3.
Platform Rotator
12
5, 11
8
4.
Footswitch
1, 11
5.
Controller
1, 11
6.
Switches
1, 11
7.
Placards and Decals
1, 2
8.
Control Tags
1, 2
9.
Hoses and Cables
1
4, 5, 8
10.
Pins
8
11.
Bushings
8
12.
Wear Pads
8
13.
Cylinders
1, 5, 6, 13
TURNTABLE
1.
Gauges/Ground Controls
1, 2, 11
2.
Valves
1, 11
5
3.
Hydraulic Hoses
1
5
4.
Shields
1
5.
Limits Switches
1, 7
6.
Placards and Decals
1, 2
7.
Swing Bearing
1
9, 12
8.
Swing Motor
1, 5, 6
8
CHASSIS
1.
Batteries
3
5
2.
Wheel and Tire Assemblies
1
8, 9, 15
3.
Drive Motors
1, 5, 6
4.
Drive Torque Hubs *
1, 5, 6
3
5.
Drive Brakes
1, 5, 6
6.
Hydraulic Pump/Motor
1
5
7.
Steer Components
1
4, 6
8
8.
Front Axle Pin
1
8
9.
Hydraulic Oil Tank *
3
5
4
10.
Breather - Hydraulic Tank
6, 14
11.
Hydraulic Hoses and Tubing
1
5
12.
Placards and Decals
1, 2
13.
Tilt Alarm Switch
1
14.
Shields
1
15.
Wheel Bearings *
8
16.
Swing Bearing/Worn Gear
1
9, 12
THIS PAGE LEFT BLANKINTENTIONALLY