Section 2 - pre-operation and controls, Warning – JLG 4017 Eccupped for Platform Operator Manual User Manual
Page 159

Section 2 - Pre-Operation and Controls
2-1
31200029
SECTION 2 - PRE-OPERATION AND CONTROLS
2.1
PRE-OPERATION CHECKS & INSPECTION
Note: Complete all required maintenance before operating unit.
A walk-around inspection of the telehandler is to be completed first. Refer to the
Operator & Safety Manual supplied with telehandler.
Walk around inspection of the platform must be performed at beginning of each work
shift or at each change of operator.
Ensure all Safety decals are legible and in place. Clean or replace as required. See
“Safety Decals” on page 2-3.
WARNING
FALL HAZARD. Use extreme caution when checking items beyond your normal
reach. Use an approved ladder. Failure to comply could result in death or serious
injury.
This manual is related to the following products: