Battery charging (on board charger), Battery charging (on board charger) -47 – JLG M450 ANSI Service Manual User Manual
Page 87

SECTION 3 - CHASSIS & TURNTABLE
3121127
– JLG Lift –
3-47
NOTE: The engine will automatically shut down under the
following conditions:
High Engine Oil Temperature
Low Engine Oil Pressure
Engine Overspeed
Generator Overvoltage
Batteries fully charged
TO AVOID INJURY FROM AN EXPLOSION, DO NOT SMOKE OR
ALLOW SPARKS OR A FLAME NEAR BATTERY DURING SERVIC-
ING. ALWAYS WEAR EYE AND HAND PROTECTION WHEN SER-
VICING BATTERIES.
Battery Charging (On Board Charger)
1. For maximum battery life:
a. Avoid completely discharging the batteries.
b. Fully charge the batteries each day the machine
is used.
c. Charge the batteries at available times between
charging.
d. Be sure the battery fluid covers the battery
plates before charging, but to avoid overflow, do
not top off the fluid level until charging.
2. To charge the batteries, connect the charger to a
115 volt source with a 15 amp minimum capacity.
3. The Charger will shut off automatically when the bat-
teries are fully charged.
4. The charge cycle is complete when the ammeter
reads 0 amps. Any reading indicates the charge
cycle is not complete.
5. Depleted batteries will take approximately 17 hours
to charge.
Figure 3-18. Batteries and Battery Charger (Prior to S/N 0300059350)