beautypg.com

4 selecting the location, 5 electrical connections, Selecting the location – Eppendorf Excella E-5 Classic Platform Shaker User Manual

Page 14: Electrical connections

background image

Installation
New Brunswick Excella® E-5 Open Air Shaker
English (EN)

14

4.4

Selecting the location

Physical Location

It is essential that the instrument be situated in a area where there is sufficient space for the shaker and
platform to clear walls and obstructions during operation.

The surface on which the E-5 is placed must be smooth, level, and able to support the shaker under full
load operating conditions.

Operating Environment

The shaker is designed to operate optimally in the following ambient conditions:

• 5 – 45 °C
• 20 – 80 % Relative Humidity non-condensing
• Up to 2000 m

4.5

Electrical connections

Before making electrical connections, verify that the power source voltage matches the voltage on the
ELECTRICAL SPECIFICATION PLATE and that the ON/OFF SWITCH is on the OFF position. The
ELECTRICAL SPECIFICATION PLATE and the ON/OFF SWITCH are located on the rear panel (see
Fig. 3-1 on p. 9).

Description

Part No.

Quantity

Application

10

24

×

5/16

in

(7.9

mm)

flat Phillips head screw

S2116-3051

1

5/16 in (7.9 mm) thick
aluminum, phenolic and
stainless steel platforms.

The previous table also applies to 2800 ml Fernbach Flask Clamps.

WARNING!

Do not position the equipment so that it is difficult to unplug from the mains/power.

CAUTION!

A detachable main power cord has been provided with your unit. Only use the cord
provided and do not replace cord with an inadequately rated cord.