Snorkel UL40 User Manual
Page 7

7
UL LIFT LABEL INSTALLATION: THESE LABELS SHALL BE PRESENT AND IN GOOD
CONDITION BEFORE OPERATING THE WORK PLATFORM. BE SURE TO READ,
UNDERSTAND AND FOLLOW THESE LABELS WHEN OPERATING THE WORK PLATFORM.
Note:
Labels
can
be
ordered
by
using
Part
N
umber
located
by
each
label.
For
m
achines
equipped
with
options
consult
Service
M
anual.
62218-001
2-REQUIRED
66554-002
1-REQUIRED
66550-008
1-REQUIRED
05221-000
1-REQUIRED
D.C.
UNITS
ONLY
66552-000
1-REQUIRED
D.C.
UNITS
ONLY
62217-000
1-REQUIRED
05223-003
1-REQUIRED
SERIAL
#
15001
TO
21690
62322-000
1-REQUIRED
62725-002
1-REQUIRED
62466-002
1-REQUIRED
62814-000
1-REQUIRED
62575-001
1-REQUIRED
62876-000
1-REQUIRED
03610-000
1-REQUIRED
66553-001
2-REQUIRED
62792-000
2-REQUIRED
1
AT
EACH
SWITCH
66557-009
1-REQUIRED
UL32
&
UL40
ONLY
66557-011
1-REQUIRED UL25
ONLY
66551-005
2-REQUIRED
61205-000
1-REQUIRED
62821-002
1-REQUIRED
62840-000
1-REQUIRED
005223-005 1-REQUIRED SERIAL
#
21691
TO
CURRENT