Operation Manual

068017-022 ULII

Outrigger Installation

O

UTRIGGER

I

NSTALLATION

Figure 3:

Installing Outriggers

1. Remove the outriggers from storage

locations on the sides of the mast.

2. Insert into the outrigger socket in the

base (Figure 1).

3. Push in until the locking pin engages

the hole in the end of the outrigger. Pull
outward on the outrigger to ensure
engagement.

4. Repeat the above steps for all other

outriggers. Make sure all four (4) lock-
ing pins are engaged.

5. Level the base, centering the bubble in

the orbit level on the base by adjusting the screwjacks (turn clockwise) at the end of each outrigger. DO
NOT release the tension (turn counterclockwise) on an outrigger to level the base.

6. All four (4) screwjack pads must be in solid contact with a firm surface and each outrigger indicator light

must be lit before the platform is elevated.

S

AFETY

I

NTERLOCK

T

EST

D A N G E R

NEVER perform this test from the platform.

1. Properly install all four (4) outriggers and level the base.

2. Release the tension on one (1) outrigger by turning the screwjack counter clockwise until the indicator

light is no longer lit.

3. While standing on the ground, activate the control panel to elevate the platform. The platform should

not elevate.

4. Re-level the base.

5. Repeat steps 2, 3 and 4 until all four (4) outriggers have been tested.

D A N G E R

DO NOT use a machine that elevates when the tension has been released on an outrigger. The
machine must be repaired before using.

Bubble Level

Indicator Lights

Locking Pin

Screwjack