3. Plug connector from rear wheels into connector

from chassis wiring.

Wheel Installation

1. After outriggers have been installed, turn

screwjacks clockwise until wheels can be

installed.

2. Install rear wheels into rear outriggers. Pin

wheels in place using pins provided.

Figure 2: Installing wheels

Outrigger Installation

1. Remove the outriggers from storage locations

on sides of mast.

2. Insert into outrigger socket in base (Figure 1).
3. Push in until locking pin engages hole in end of

outrigger. Pull outward on outrigger to ensure

engagement.

4. Repeat the above steps for all other outriggers.

Make sure all four (4) locking pins are engaged.

5. Level the base, centering the bubble in the orbit

level on the base by adjusting the screwjacks at

the end of each outrigger (Figure 1). DO NOT

release the tension on an outrigger, by turning

counterclockwise, to level base.

IMPORTANT: All four (4) screwjack pads must be

in solid contact with a firm surface and each

outrigger indicator light must be lit before the

platform is elevated.

Figure 1: Installing outriggers

Indicator Light

Level Sensor

Locking Pin

Screwjack

Figure 3: Connecting rear wheel cables

Wheel

connecting

pins

Base

Connector

Rear

Wheel

Connector

Level

Sensor

Outrigger