Periodical maintenance and checks, Storage, Lubrication – Snorkel Pop-Up Push 6 Eco User Manual
Page 15: Continued)

Page 14 of 23
Pop-Up PUSH 6 ECO
Operator’s Safety and Maintenance Handbook (v.0.4.0409)
Section 5
MAINTENANCE
Periodical maintenance and checks
(continued)
Prior to first use of the
POP-UP PUSH 6 ECO
, all daily/pre-use checks must be
undertaken. If the machine has been in storage for a long period of time, it may be
necessary to undertake checks and tests as per the table on the preceding page (e.g.
lubrication, hydraulic oil, battery condition).
The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) require that
lifting equipment for lifting persons must be THOROUGHLY EXAMINED every six
months.
Following any maintenance on the
POP-UP PUSH 6 ECO
, a full function test should
be undertaken to ensure correct operation of the machine.
It is essential that only manufacturer’s approved replacement parts are used when
maintaining and servicing the
POP-UP PUSH 6 ECO
.
Failure to do so may result in an unsafe or unstable machine.
Storage
The electrical components of this
POP-UP PUSH 6 ECO
are not protected from
external weather conditions and the machine should therefore not be stored outdoors.
Storage in a clean, dry indoor environment is recommended.
Frequent checks on the condition of the machine should be made to ensure no
excessive deterioration occurs due to the environment in which the machine is housed.
Lubrication
The required lubrication points are listed as per the table on the preceding page.
These include: roller guides, grease nipples, pivot pins and castor mounts.
The lubricant recommended for use with this
POP-UP PUSH 6 ECO
is: standard
machine grease.