Snorkel M2639J-sn350+ User Manual
Page 10
Page 4
3 S
AFETY
I
NSPECTION
mains cable is disconnected from the battery charger. Check the electrolyte level in
each battery cell. Top up as necessary with distilled water only.
5. Use the automated battery top-up system fill the batteries to the correct electrolyte
level. This is done by opening the shut off valve and pressing the green fill button for
approximately 10 seconds, then re-closing the shut-off valve.
Batteries should be examined for cracks, acid leakage and terminal corrosion. Take
corrective action immediately if either check fails.
Figure 3: Battery Fill Button & Valve
Figure 4: Lower Control Panel
6. Prior to operating the functions, check that the upper and lower emergency stop
buttons on each control station are retracted; turn clockwise if necessary. Carry out the
Battery fill Button
Shut off Valve
In CLOSED Position
C A U T I O N
!
!
Vehicles fitted with the automated battery top-up system with shut
off valve, top up the battery cells with distilled water using the
electrolyte fill button, ensuring that the shut-off valve is open during
the fill and closed after use.
This is the only time this valve should be opened.
1. Enable Button
2. Analog Rocker
3. Mast Button
4. Jib Button
5. Rotate Button
6. Emergency Stop
1
3
5
2
4
6