J.P. Instruments EDM 960 Twin Primary Installation Manual User Manual
Page 35

FAA Approved Installation Manual for the EDM-960 system Report No 909
Primary Engine Data Management System Page 35 of 46 Rev D
Date 2-6-2014
38. Programming the K factor
This procedure is different than for setting other parameters.
1. If you haven’t already done so, start the Pilot Program procedure; by simultaneously hold the STEP and LF buttons
for five seconds. You will see the word PROGRAM, followed by FUEL N.
2. Tap STEP button to advance to the FFLW? N screen.
3. Tap LF to enter the fuel flow submenu.
4. Tap STEP repeatedly until you see KF = 29.90 (for example)
5. Hold both the STEP and LF buttons simultaneously for five seconds. The first digit flashes (shown here as a larger
digit only for illustration purposes): 29.90
6. Tap or hold the LF button to change flashing digit: I 9.90
7. Tap STEP button for next digit (hold STEP for previous digit): I 9.90
8. Tap or hold the LF button to change flashing digit: I 8.90
9. Tap STEP button for next digit (hold STEP for previous digit): I8.90
10. Repeat items 9 and 10 for the remaining two digits.
11. Hold STEP and LF buttons simultaneously for five seconds to exit the K factor parameter setup.
12. Tap STEP repeatedly until you see END? Y, then Tap STEP once more to exit the factory setup mode.