ARB RD90 User Manual
Page 3

Table of Contents:
1
1 Introduction
3
1.1 Pre-Installation Preparation
3
1.2 Tool-Kit Recommendations
4
1.3 Assembly Type Identification
5
2 Removing the Existing Differential
6
2.1 Vehicle Support
6
2.2 Differential Fluid Drain
6
2.3 Removing the Differential Assembly
6
2.4 Checking the Current Backlash Amount
8
2.5 Removing the Differential Center
10
3 Installing the Air Locker
11
3.1 Approximate Backlash Shimming
11
3.2 Calculation & Selection of Backlash Shims
13
3.3 Mounting the Ring Gear
14
3.4 Installing the Carrier Bearings
15
3.5 Preload Shim Measurement
16
3.6 Calculation & Selection of Preload Shims
18
3.7 Drilling & Tapping the Bulkhead Port
19
3.8 Installing the Bulkhead Fitting
21
3.9 Installing the Differential Center
21
3.10 Setting Up the Bulkhead Fitting
24
3.11 Final Assembly
25
3.12 Checking the Backlash
27
3.13 Bench Testing the Air Locker
30
3.14 Reinstalling the Differential Assembly
31
4 Installing the Air System
32
4.1 Mounting the Solenoid
32
4.2 Running & Securing the Air Line
34
4.3 Connection to the Bulkhead Fitting
35
5 Mounting & Connecting the Electrical System
36
5.1 Mounting the Actuator Switch(es)
36
5.2 Wiring the Actuator System
37
6 Testing & Final Assembly
40
6.1 Leak Testing
40
6.2 Testing the Air Locker Actuation
40
6.3 Re-Sealing & Filling the Differential
41
6.4 Note For ADD Equipped Vehicles
41
6.5 Post-Installation Check List
42
7 Parts List
43
7.1 Exploded Assembly Diagram
43
7.2 Itemized Parts List
44