beautypg.com

3 installing the air locker, Installing the bulkhead fitting, Installing the differential center – ARB RD90 User Manual

Page 23

background image

3 Installing the Air Locker

21

NOTE : The drawing in Figure 13. shows a cross section of

the bulkhead body installed into the clamshell. This
shows how critical it is to position the bulkhead port
on an angle of approximately 25º in the deepest part of
the cavity in the clamshell to allow room for the seal
housing tube.

c Tap the hole from the outside using a ¼” NPT pipe tap.
c Remove any sharp edges from the hole that may chip-off and fall

into the housing.

c Carefully remove the rag and inspect with a service light inside the

housing to insure no metal filings are left behind.

3.8

A

B

Installing the Bulkhead Fitting

c To obtain an oil tight seal, apply a thread sealant to the threads of

the bulkhead body, screw it into the bulkhead port (from the
outside), and tighten.

c Wipe the area clean of any excess thread sealant (inside and

outside of the housing).

3.9

A

B

Installing the Differential Center

c Apply a thin film of high pressure grease to the outside of the

tapered roller bearing cup supplied with the Air Locker.

c Using a bearing press or arbor press, press the bearing cup into the

seal housing (narrow edge first) until it stops at the end of the bore.

NOTE :

Do not install the bearing cup upside down. Refer to
Figure 14. for the correct installation direction.
Be careful not to bend the seal housing tube or
damage the O-ring grooves.

Figure 14.