ARB RD114 User Manual
Page 3

Table of Contents:
1
1 Introduction
3
1.1 Pre-Installation Preparation
3
1.2 Tool-Kit Recommendations
4
2 Removing the Existing Differential
5
2.1 Vehicle Support
5
2.2 Differential Fluid Drain
5
2.3 Removing the Axles
6
2.4 Marking the Bearing Caps
6
2.5 Checking the Current Backlash Amount
7
2.6 Removing the Differential Carrier
8
3 Installing the Air Locker
9
3.1
Re-Mounting the Ring Gear
9
3.2
Assembling the Seal Housing
10
3.3
Installing the Carrier Bearings
11
3.4
Drilling and Tapping the Bulkhead Port
12
3.5
Checking for Assembly Clearance
13
3.6 Final Air Locker Assembly
14
3.7
Checking the Backlash
15
3.8
Profiling the Seal Housing Tube
16
3.9
Setting Up the Bulkhead Fitting
17
3.10
Reinstalling the Differential and Axles
19
4 Installing the Air System
20
4.1 Mounting the Solenoid
20
4.2 Running & Securing the Air Line
22
4.3 Connection to the Bulkhead Fitting
23
5 Mounting & Connecting the Electrical System
25
5.1 Mounting the Actuator Switch(es)
25
5.2 Wiring the Actuator System
26
6 Testing & Final Assembly
30
6.1 Leak Testing
30
6.2 Testing the Air Locker Actuation
31
6.3 Re-Sealing & Filling the Differential
31
6.4 Post-Installation Check List
32
7 Parts List
33
7.1 Exploded Assembly Diagram
33
7.2 Itemized Parts List
34