ARB RD93 User Manual
Page 3
![background image](/manuals/545476/3/background.png)
Table of Contents:
1
1 Introduction
3
1.1 Pre-Installation Preparation
3
1.2 Tool-Kit Recommendations
4
2 Removing the Existing Differential
5
2.1 Vehicle Support
5
2.2 Differential Fluid Drain
5
2.3 Removing the Axles
5
2.4 Marking the Bearing Caps
6
2.5 Checking the Current Backlash Amount
7
2.6 Removing the Differential Carrier
8
3 Installing the Air Locker
10
3.1 Mounting the Ring Gear
10
3.2 Installing the Carrier Bearings
11
3.3 Drilling and Tapping the Bulkhead Port
12
3.4 Setting the Backlash
13
3.5 Profiling the Seal Housing Tube
14
3.6 Setting up the Bulkhead Fitting
16
3.7 Re-Installing the Axles
18
4 Installing the Air System
19
4.1 Mounting the Solenoid
19
4.2 Running & Securing the Air Line
21
4.3 Connection to the Bulkhead Fitting
22
5 Mounting & Connecting the Electrical System
23
5.1 Mounting the Actuator Switch(es)
23
5.2 Wiring the Actuator System
24
6 Testing & Final Assembly
27
6.1 Leak Testing
27
6.2 Testing the Air Locker Actuation
27
6.3 Re-Sealing & Filling the Differential
28
6.4 Post-Installation Check List
29
7 Parts List
31
7.1 Exploded Assembly Diagram
31
7.2 Itemized Parts List
32