beautypg.com

Iv. service – Burnham SM-6 User Manual

Page 23

background image

23

IV. Service

1

GENERAL — Inspection should be conducted
annually. Service as frequently as specifi ed in
paragraphs below. While service or maintenance is
being done, Electrical Power and all Gas Supply to the
Boiler must be “off.”

N

O

I

T

U

A

C

n

e

h

w

n

o

i

t

c

e

n

n

o

c

s

i

d

o

t

r

o

i

r

p

s

e

r

i

w

l

l

a

l

e

b

a

L

e

s

u

a

c

n

a

c

s

r

o

r

r

e

g

n

i

r

i

W

.

s

l

o

r

t

n

o

c

g

n

i

c

i

v

r

e

s

y

f

i

r

e

V

.

n

o

i

t

a

r

e

p

o

s

u

o

r

e

g

n

a

d

d

n

a

r

e

p

o

r

p

m

i

.

g

n

i

c

i

v

r

e

s

r

e

t

f

a

n

o

i

t

a

r

e

p

o

r

e

p

o

r

p

2

VENT

SYSTEM

Vent

system (see Figure 4 for

typical installation) should be checked annually for:

a. Obstructions

b. Accumulations of soot

c. Deterioration of vent pipe or vent accessories due to

condensation or other reasons

d. Proper attachment of vent cap and sealant around

wall penetration

e. Remove vent cap and clean accumulations of

soot and dirt with wire brush and vacuum. See
Figure 16. Remove any obstructions. Replace all
deteriorated parts.

3

CLEANING BOILER FLUES (See Figure 16).

Flue passageways in the boiler sections should be

checked annually for any blockage or accumulation of
soot. To obtain access to fl ueways:

a. Remove jacket front panel.

b. Remove sheet metal screws securing combustion

area enclosure cover and remove cover. Exercise
care when removing to prevent damage to enclosure
gasket.

c. Remove fan assembly after disconnecting electrical

leads and vent tube. Care should be exercised to
avoid damage to gaskets.

d. Remove four (4) bolts securing canopy and remove

canopy — fl ueways are now exposed.

Using

a

fl ashlight, examine all fl ue passageways.

If passageways are free of soot and obstruction,
replace canopy, secure and seal using kit available
from Burnham distributors.

e. Replace fan, connect vent tube and electrical wiring.

f. Reinstall and secure enclosure cover and jacket front

panel.

If

the

fl ue passageways need cleaning, remove

burners as described in paragraph 4 below. Using
long handle wire or bristle fl ue brush and vacuum,

brush fl ueways thoroughly from top of boilers as
illustrated in Figure 16. Replace canopy and seal.

4

BURNERS AND FIREBOX SHOULD BE

CLEANED ANNUALLY

a. Remove jacket front panel.

b. Remove sheet metal screws securing enclosure

cover and remove cover exercising care with gasket.

c. Remove TCO leads from TCO and remove burner

access panel.

d. Brush top of burner with a soft bristle brush and

vacuum burner, see Figure 16. Check orifi ce to see
that drilled passageway is free of lint and dirt.

e. Vacuum tips of pilot burner.

f. Clean

fi rebox by vacuuming. Exercise care not to

disturb insulation inside base.

5

REMOVAL OF BURNER ASSEMBLY

a. Disconnect pilot tubing coupling, ignition cable and

ground wire from pilot assembly.

b. Disconnect gas valve at union between valve and

bulkhead penetration.

c. Remove two fasteners attaching burner to bulkhead

and single fastener for burner end support.

d. Grasp burner, tilt upward and remove from unit.

e. INSTALL BURNER by reversing procedure used

to remove.

6

REMOVAL OR REPLACEMENT OF PILOT
ASSEMBLY OR PILOT ASSEMBLY PARTS

a. If pilot assembly, sensor or pilot orifi ce need

replacement, remove jacket front panel, enclosure
cover and burner access panel using procedure
described in paragraph 4 above.

b. Disconnect pilot tubing, ground wire and ignition

sensor cable.

c. Remove two machine screws holding pilot burner to

pilot bracket.

d. Reinstall pilot burner by reversing above procedure.

e. Check pilot and main burner fl ames, refer to Figures

14 & 15.

7

CHECK MAIN BURNER AND PILOT FLAMES,
refer to Section III, paragraphs 6 and 10.

8

CHECK ALL CONTROLS ANNUALLY, see
procedure in Section III, paragraphs 7, 8, 9, 11 and 12.

MAINTENANCE OF LOW WATER CUTOFF
— During the heating season, if an external fl oat type
low water cutoff is on the boiler, the blow off valve
should be opened once a month (use greater frequency