beautypg.com

Quick setup list – Briggs & Stratton 500Z - 26 User Manual

Page 2

background image

500Z 26HP - 48” Mower Deck

TP 300-7368-IR-ZT-N

1/2008

2

Quick Setup List -

Page

Setup Procedure

Steps to Perform

3

Uncrating

❏ Remove Crate & Banding.
❏ Disengage Transmission Release Levers.
❏ Release Parking Brake and Roll Tractor forward off skid.
❏ Engage Transmission Release Levers.

3

Battery Installation

❏ Install Battery.

4

Tractor Assembly

❏ Assemble the Ground Speed Control Levers.
❏ Assemble the Seat.

5

Check Fluid Levels

❏ Check Engine Oil level.
❏ Check Hydraulic Oil level.
❏ Check Tire Pressure

6

Check Mower Assembly

❏ Check Blade Bolt Torque.
❏ Check & Adjust Deck Lift Rod Timing.
❏ Check & Level Mower Deck.
❏ Check Deck Drive Belt.

10

Lubrication &

❏ Lubricate all grease & oil points.

Fuel Preparation

❏ Add fuel.
❏ Start the Engine.

12

SAFETY CHECKS

❏ Check for LOOSE HARDWARE.
❏ Check all OPERATOR CONTROLS.
❏ Perform SAFETY INTERLOCK SYSTEM CHECK.