beautypg.com

Maintenance and lubrication schedule – Braun NL955 User Manual

Page 50

background image

Maintenance and Lubrication Schedule

Perform all procedures listed in previous section also

Inspect switch arm components for wear or dam-
age, and for proper operation.

Inspect microswitches for securement and proper
adjustment.

Make sure lift operates smoothly.

Inspect external snap rings/e-clips:
• Rotating pivot slide arm pivot pins (2 per pin)
• Rotating pivot slide arm roller axles (2 per pin)
• Platform cylinder pivot pins (2 per pin)
• Platform fold axles (1 per axle)
• Inboard locator lever bracket pins (1 per pin)
• Lift-Tite

latch gas (dampening) spring (2 per

spring)

Inspect platform fold axles and bearings for wear
or damage and positive securement.

Inspect Side Entry for proper operation, positive
securement and wear or damage to nylon belt and
roller chain.

Replace defective parts.

Resecure, replace or adjust as needed.

Realign towers and vertical arms. Lubricate or
correct as needed.

Resecure or replace if needed.

Replace defective parts and resecure as needed.
Apply Light Oil.

Correct or replace defective parts.

1500

Cycles

continued

Page 48